The goal
What the project needed to achieve
Add a three-piece bathroom and wet bar to an unfinished basement while keeping the rest of the house in service.
Approach
How it was handled
- 01The available drain invert was confirmed first, because it determines what layout is actually possible below grade.
- 02Slab cutting was planned to minimise the opening and keep dust controlled.
- 03Isolation allowed the rest of the home to keep water throughout the project.
- 04Inspection stages were booked against the contractor's schedule so framing and insulation were not delayed.
Installed components
What went in
A component list makes a project record useful years later, when somebody needs to service what was installed.
- Below-slab drainage for shower, lavatory and toilet
- Vent connections tied into the existing stack
- Wet bar supply and drain
- Rough-in valves for the new shower
- Complete fixture set at finishing stage
Project gallery
Representative imagery
Licensed stock photography used to demonstrate the gallery layout. No before-and-after pairings are implied.




Request similar work
Considering something like this?
Tell us what you have in mind. We will explain what is involved and whether a site visit is needed before an estimate is meaningful.
More case studies
Other examples
Bathrooms
Main bathroom refit with relocated vanity
A dated main bathroom reworked with a moved vanity, new drainage alignment and a full fixture set.
Kitchens
Kitchen sink relocation and appliance rough-in
Sink moved to a new island position with dishwasher and refrigerator connections coordinated to the cabinetry plan.
Mechanical rooms
Mechanical room reorganisation and labelling
Years of piecemeal additions tidied into a serviceable layout with isolation valves and clear labelling.