Your·SiteWinnipeg Plumbing

Renovations & new construction

Plumbing that fits the drawing, the site and the schedule

Project plumbing is a sequencing problem as much as a technical one. We work from your documents, not from assumptions.

Plumbing tools and a faucet resting on an architectural drawing
Photo: AS Photography / Pexels

Project types

Work we plan for

Different project types put pressure on different parts of the process — the earlier we see the scope, the fewer surprises there are.

  • Glass-walled shower room next to a toilet and washbasin on tiled flooring

    Bathroom renovations

    Rough-in for relocated fixtures, valve selection, and finish plumbing after tile.

  • Modern kitchen faucet on a granite countertop with appliances behind

    Kitchen renovations

    Sink relocation, appliance connections and coordination with cabinetry drawings.

  • Newly installed underground pipework and fittings at a construction site

    Basement developments

    Below-grade drainage, vent routing and bathroom or wet bar additions.

  • Stack of grey PVC drainage pipe stored on a construction site

    Additions

    Extending supply, drainage and venting into new space without compromising the existing system.

  • Plumbing tools and a faucet resting on an architectural drawing

    New homes

    Full rough-in and finish plumbing coordinated with the build programme.

  • Stainless steel pipework and equipment inside a commercial mechanical plant

    Commercial build-outs

    Tenant improvements and washroom groups scheduled around the wider fit-out.

Representative photography — replace with the company's own project images.

Project process

Seven stages, in order

Each stage has a clear output. Nothing moves forward on a verbal maybe.

  1. STAGE 01

    Scope review

    We read the drawings, fixture schedule or wish list and raise the questions that affect cost before anything is priced.

  2. STAGE 02

    Site assessment

    A walk-through of existing conditions — services, structure, access and anything the drawings do not show.

  3. STAGE 03

    Planning and estimate

    A defined scope with written assumptions, so everyone knows what is included and what would change it.

  4. STAGE 04

    Rough-in

    Supply, drainage and venting installed to the agreed layout and prepared for inspection.

  5. STAGE 05

    Coordination with other trades

    Framing, electrical, HVAC, tile and cabinetry sequenced so no trade is waiting on plumbing or working around it.

  6. STAGE 06

    Fixture installation

    Finish plumbing once surfaces are complete, with fixtures set level, sealed and connected properly.

  7. STAGE 07

    Testing and walkthrough

    Systems tested under real conditions, isolation points shown, and the completed work reviewed with you.

Coordination

Fixture and equipment coordination

The most common source of renovation rework is a fixture chosen after the rough-in. We would rather chase the model numbers early.

  • Rough-in dimensions confirmed against selected products
  • Valve types matched to the shower or tub configuration
  • Cabinetry and countertop cut-outs cross-checked
  • Appliance connections planned with the kitchen layout
  • Water heater sizing reviewed against the new fixture count
  • Blocking for grab bars or wall-hung fixtures flagged before framing closes

Who we work with

Homeowners, designers, builders and GCs

  • Homeowners

    Managing your own renovation and want a plumbing scope you can actually plan around.

  • Designers

    Need fixture selections checked against rough-in constraints before specification is locked.

  • Builders

    Want a plumbing trade that turns up when the schedule says and leaves the site ready for the next stage.

  • General contractors

    Need a defined scope, predictable inspection milestones and clear communication.

Project enquiry

Send the scope, the drawings or just the idea

Plans, specifications, inspiration images or supporting documents can all be attached. A scope review is the first step either way.

Useful to include

  • Floor plans or elevations, even in sketch form
  • Fixture model numbers if they have been selected
  • Whether the property is occupied during the work
  • Other trades already engaged, and who is sequencing them
  • Target dates for rough-in and completion

Up to 6 files, 12 MB each. In this demonstration the file names are recorded with your enquiry and images are previewed locally — no files are uploaded or stored.

Prefer to talk it through? Call (204) 555-0142 · Privacy

Next step

Planning a project this year?

Send the scope through, or call to talk it over. Early conversations are the cheapest part of any renovation.